Skip to main content

Phase 1 to Sector 53-54 Metro Route

Gurgaon Metro • 2026 Updated

Token Fare
₹14
Smart Card
₹14
Travel Time
14 min
Distance
8.2 km
Stations
8
Interchanges
0
Reverse Route

Station-by-Station Route

Phase 1 START
Rapid Metro • PH1
Rapid Metro • SKP
1.17 km
2 min
Rapid Metro • DF2
1.17 km
2 min
Rapid Metro • BVT
1.17 km
2 min
Rapid Metro • GWT
1.17 km
2 min
Rapid Metro • MLA
1.17 km
2 min
Rapid Metro • IBC
1.17 km
2 min
Rapid Metro • S53
1.17 km
2 min

Fare Comparison

Fare TypeSingleReturnMonthly (26)
Token / Cash ₹14 ₹28 ₹364
Smart Card SAVE ₹14 ₹28 ₹364
Monthly Savings ₹0

Phase 1 to Sector 53-54 Route Guide

This Gurgaon Metro route covers 8.2 km in ~14 minutes, passing through 8 stations — no interchange needed.

Fare Details

Token fare: ₹14. Smart card: ₹14 (save ₹0/trip, up to ₹0/month).

FAQ

Token fare: ₹14. Smart card: ~₹14 (10% discount).

Approximately 14 minutes covering 8.2 km with 8 stations.

8 stations including start and end.

No, this is a direct route — no line changes required.

Route Summary

FromPhase 1
ToSector 53-54
MetroGurgaon Metro
First Train06:00 AM
Last Train11:00 PM
FrequencyEvery 3-8 min

Save with Smart Card

Save ₹0 on every trip on this route.

Learn About Smart Cards